HS2 Completes a UK-first with 4,600 tonne bridge slide December 16, 2025 2 0 News HS2 and Balfour Beatty completed a 17 hour long operation where they managed to slide a 4,600 tonne viaduct over the M6, all the while traffic was still moving underneath. Want to watch the bridge slide itself? click the link below: